Page 54 of 56 · scan clean

AAWSAP DIRD Space Access Where Weve Been and Where We Could Go March 8 2010

UNCLASSIFIED/ ;'FOR: OFFI&IAk W&lii 8Pn.Y
Appendix C: TAV Operational Costs
Art Robinson was the deputy program manager for the MDC Manned Aerospace Vehicle Group at MDC Astronautics, Huntington Beach. Working with Art, the St. Louis part of the team prepared a work breakdown structure for servicing and maintaining an Air Force transatmospheric vehicle (TAV) based on a B-52 squadron. Larry Fogel of Decision Sciences visited several B-52 bases and discussed the operational concept and repair/maintenance work structure with the B-52 crews and maintenance personnel. The result was an estimate of the costs for operating a squadron of TAVs that had the same flight frequency as the B-52 squadron. The result for the one-and-a-half-stage TAV is shown in Figure 45. As might be expected, orbital operations are substantially more costly than atmospheric operations (aerodynamic cruise of hypersonic long-range glide). With an operational range greater than a refueled B-52, the TAV has a lower cost than the once-refueled B-52. The orbital cannot be compared directly with a B-52 since in achieving orbit the TAV has essentially infinite cruise range and duration limited only by the crew. The concept of operations was essentially that shown in Figure 37 installed on a U.S. Air Force SAC base. Although the SAC flight crews concentrated on potential nuclear missions, the presentation focused on a wide spectrum of kinetic penetrators installed in a rocket-accelerated entry nose cone. The terminal speed of the entry nose cone was in the 12,000 to 14,000 feet/second range. At that speed the energy delivered per unit weight was much greater than a spherical charge of HBX-6 because the kinetic energy was directly delivered to the target. The weapons spectrum could address a very wide range of targets that could be disabled or made nonfunctional or be destroyed with minimal collateral damage.

Cost $97,000,000 tmospheric Cmise Cost $71,000,000 B-52 only*

$251,000,000 Orbital

140 000,000 Refueled B-52

*annual costs per DAA (14 vehicles)

Larry Fogel Decision Sciences Titan Corporation Spring 1984

Figure 45. McDonnell Douglas Astronautics (Huntington Beach)-Funded Study of TAV Operational Costs

47 UNCLASSIFIED/;CFOR: OFFI&IAk W&lii 8Ptklf