Page 41 of 56 · scan clean

AAWSAP DIRD Space Access Where Weve Been and Where We Could Go March 8 2010

UNCLASSIFIED//f81l Offl@IAL WSI: &PUs.lf

As per the U.S. Air Force requirements

we were working with, these TAV were

piloted and therefore had retractable

crew stations that could provide forward

visibility when permitted by thermal

conditions. The launch system (see

Figure 36) was adopted from the U.S .

Air Force Thor IRBM launch system and

from observations when the author was

at Baikanour, Kazakhstan. The vehicles

were in dry horizontal storage and were

serviced and loaded horizontally. The

hanger/shelter was rolled back for

erection to vertical position and then

fueled. The launch sequence was

patterned atter the Baikanour Soyuz launch , which is 12 hours. The Thor IRBM launch sequence (LOX/RP-1) was

Figure 36. Simple Horizontal Integration and Vertical Launch Provides Rapid Launch Capability

15 to 18 minutes. As in Baikanour, the payloads are not to be loaded into the vehicle

and t hen remain there for weeks before checking out. What is loaded into the vehicle

are checked-out payloads that need only to be attached to the carrying hardware. At

Baikanour there were about seven pre-checked out Soyuz and Progress payloads in

plastic wrap inerted with argon . The goal was to be able to launch a Soyuz launcher

within 7 to 12 hours in the event of an orbital emergency. The Soyuz launchers were in

dry storage and brought in on a railcar.

With the Russian fully automatic

checkout and fueling approach, this

would certainly be possible. Figure 37

shows an artist's illustration of a TAV

launch and recovery operational base.

The boosters are a concept from Joe

Thurgau of MDC Huntington Beach

"Toss-Back" boosters that, after

separation, rotate 180 degrees and fire

their rocket motors to "toss back" to the

launch site. An infrared guidance

system steers the booster to a recover

lake for a powered vertical landing

(upper righthand portion of the

illustration). The booster rocket engines

are nongimbaled, sealed with the heat

shield base. Either the 1-½ stage or the 2-stage systems could be launched. It would have even been possible to launch

Figure 37. A Vertical Launch Complex Provides Vertical Toss Back Booster Recovery and Horizontal Landing Facilities for the Hypersonic Gliders

a booster by itself to rapidly transport it to another launch site (lower center portion of

the illustration). Runways are provided for returning hypersonic gliders (upper center

portion of the illustration), as well as for service and supply aircratt. Housing,

maintenance facilities, and other buildings are on adjacent property. It certainly would

be possible to launch this system from Vandenberg Air Force Base or Cape Canaveral,

34
UNCLASSIFIED/ fFOlil &FFl@IAL U.!I!! t>IIL I